530 – 24 Parks Vic – San Remo Bridge – Inspection and Underwater Operations – Complete 3 December 2024
460(T) – Parks Victoria 2024 – Local Port of Western Port – The Narrows San Remo Bridge – Stage 4 – Removal of Temporary Navigation Aids 31 October 2024
272(T) – 24 Parks Vic – San Remo – Bridge Stage 2 Reduced Air Draught Navigation Direction 26 June 2024